Page 1 of 1

Central Station

Posted: Wed 22nd Sep 2021 12:35 pm
by Flemish
Does anybody know why they’re adding a platform bottom about 2 meters above the canal bottom that they laid concrete on? They have built it on metal structures that include white, round top columns, covered in a black material, and then concrete poured on it. They’re laying concrete now on the far end piece. Any stoner engineers know the answer?

Re: Central Station

Posted: Thu 23rd Sep 2021 11:20 am
by WLow
It probably is the new bike garage
https://www.fastcompany.com/90675130/th ... uatic-life

Image

Re: Central Station

Posted: Fri 24th Sep 2021 01:08 am
by FlyByNite
Remember it is Dutch, so double vowels rule.

Centraal Station is the correct spelling.

Enjoy
FlyByNite

Re: Central Station

Posted: Fri 24th Sep 2021 05:04 pm
by Flemish
The other side! There’s a webcam taxi stream that has been showing the construction. There are 2 streams of the construction. It’s been fascinating to watch, and hopefully I’ll find out about it in November, hopefully.

Re: Central Station

Posted: Fri 24th Sep 2021 10:07 pm
by WLow
this flemish dude, link us !

de hell is webcam taxi lmao

Re: Central Station

Posted: Sat 25th Sep 2021 03:14 am
by FlyByNite

Re: Central Station

Posted: Sat 6th Nov 2021 08:12 am
by Flemish
I found out the answer from a Dutch engineer.
All I got here was a Dutch lesson from a capitalist banker who doesn’t go to the Netherlands anymore, and doesn’t speak Dutch, and a CHAV looking for a fight.
Thank you to the Dutch engineer for his help.