Does anybody know why they’re adding a platform bottom about 2 meters above the canal bottom that they laid concrete on? They have built it on metal structures that include white, round top columns, covered in a black material, and then concrete poured on it. They’re laying concrete now on the far end piece. Any stoner engineers know the answer?
Re: Central Station
Posted: Thu 23rd Sep 2021 11:20 am
by WLow
Re: Central Station
Posted: Fri 24th Sep 2021 01:08 am
by FlyByNite
Remember it is Dutch, so double vowels rule.
Centraal Station is the correct spelling.
Enjoy
FlyByNite
Re: Central Station
Posted: Fri 24th Sep 2021 05:04 pm
by Flemish
The other side! There’s a webcam taxi stream that has been showing the construction. There are 2 streams of the construction. It’s been fascinating to watch, and hopefully I’ll find out about it in November, hopefully.
Re: Central Station
Posted: Fri 24th Sep 2021 10:07 pm
by WLow
this flemish dude, link us !
de hell is webcam taxi lmao
Re: Central Station
Posted: Sat 25th Sep 2021 03:14 am
by FlyByNite
Re: Central Station
Posted: Sat 6th Nov 2021 08:12 am
by Flemish
I found out the answer from a Dutch engineer.
All I got here was a Dutch lesson from a capitalist banker who doesn’t go to the Netherlands anymore, and doesn’t speak Dutch, and a CHAV looking for a fight.
Thank you to the Dutch engineer for his help.